Coldwater WWTP Expansion project: Public Information Centre #2 to be held on May 29
Township of Severn is undertaking a Class Environmental Assessment (Class EA) for the expansion of the Coldwater Wastewater Treatment Plant (WWTP) and the Main Sewage Pumping Station (SPS). The Class EA will identify and evaluate options for increasing the wastewater pumping and treatment capacity to accommodate anticipated growth in Coldwater.
The first Public Information Centre (PIC) was held in June 2023 to present details regarding wastewater infrastructure needs in Coldwater, alternative solutions for consideration, and preliminary recommendations.
A second PIC will be held in-person on May 29 to present the wastewater treatment and sewage pumping design options and the preliminary recommendations, and to acquire public feedback.
PIC details
There will be a PowerPoint presentation followed by a question-and-answer period for participants. Comments and questions can be submitted at the PIC, or using the online comment form, or by email to the contacts below.
- Date: Thursday, May 29, 2025
- Time: 4:00 p.m. to 5:30 p.m. (presentation at 4:15 p.m.)
- Location: Coldwater Community Centre, 11 Michael Anne Drive
Registration is not required.
Next steps
The presentation will be posted on the project webpage following the PIC. Comments will be accepted until June 13, 2025, and will be considered in the study.
Following PIC #2 and upon review of comments, the preferred design concepts will be selected and included in the Environmental Study Report.
Residents and interested parties can visit the project webpage for information and are encouraged to subscribe to our News and Notices page for study updates. If you would like to be added to the study’s direct mailing list, please email the project consultant.
Comments and information received during this Class EA are collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. All comments will be part of the public record.
Staff contact
Colt Newman
Manager of Capital Projects
Phone: 705-325-2315 x254
Email: cnewman@severn.ca
Project consultant
Suzanne Troxler
Tatham Engineering Limited
Manager of Water and Wastewater Engineering
Phone: 705-444-2565 x2089
Email: stroxler@tathameng.com
Contact us
1024 Hurlwood Lane
Severn, Ontario
Phone: 705-325-2315
Fax: 705-327-5818
Contact us
View and pay your bills online
Sign up to receive our News and Notices
Stay up to date on programs and projects by subscribing to our News and Notices.