Notice of road closure and culvert replacement on Wainmain Line
About the project
Township of Severn will be undertaking a major culvert replacement on Wainman Line approximately 650 metres north of Division Road West (between Riverwood Lane and Carriage Court).
This culvert replacement will require a long-term road closure beginning Monday, September 30, 2024. The project is anticipated to be completed by Fall 2025.
This work will include:
-
deep excavation and moving of materials
-
replacement of the existing culvert
-
installation of new retaining walls and remediation of the water channel
-
reconstruction of the roadway including new guiderail system, catch basins, curb, and granular and asphalt road surfaces
Road access and service impacts
A full closure at the project site is required for this work. There will be no through access for vehicular traffic, cyclists, or pedestrians on Wainman Line between Riverwood Lane and Carriage Court. Access to private driveways will be maintained in the construction area. Detour signage will be in place utilizing Warminster Road, Fairgrounds Road, and Division Road West as an alternate route.
Emergency Services (Fire, Paramedics, and Police), County of Simcoe, and the Simcoe County Student Transportation Consortium (SCSTC) have been advised of this closure. If your child is impacted as a result of this closure the SCSTS will reach out to you directly. You can also contact them by visiting simcoecountyschoolbus.ca.
Waste management services and curbside collection will continue to be provided by the County of Simcoe for the length of the project in coordination with the project contractor.
Severn appreciates your patience, understanding, and cooperation during this important construction project.
Project details and updates will be posted on our News and Notice page. Subscribe to updates to stay informed.
Project contacts
Project engineer
Project contractor
Staff contact
Township of Severn
Phone: 705-325-2315 x254